KENC Engineering Snags Key U.S. Offshore Wind Contract

Monday, January 30, 2023

KENC Engineering B.V. received a contract from an undisclosed party to design and build a Hammer Quick Lifting Frame. For hammering operations during the construction of two US offshore wind farms, KENC has the assignment to design and build a Hammer Quick Lifting Frame (HQLF). The HQLF integrates a Balltec quick connect receptacle and a 750mT piling hammer. The scope includes installation aids for easy onsite assembly. The tool will be delivered in Q1 of 2023 and deployed in the summer of 2023.

Categories: Technology Contracts Offshore Offshore Wind

Related Stories

Woodside and PEMEX to Expand Deepwater Partnership

Wison to Integrate Shell Refrigerant Technology into FLNGs

TotalEnergies Inks PPA for Offshore Wind Power from Irish Sea

Current News

Milei Vows Tougher Sanctions, Defense Push Over Falklands Oil Drilling

ABS to Support Floating Offshore Wind Development in Brazil

Proserv Secures Equinor Contract for Dudgeon Offshore Wind Farm

China Conducted Survey of Waters East of Taiwan

Subscribe for OE Digital E‑News