Veslefrikk B Platform Arrives to M.A.R.S Yard for Recycling

OE Staff
Friday, September 2, 2022

Modern American Recycling Services Europe (M.A.R.S.) said Friday that Equinor's Veslefrikk B platform had arrived in the Port of Frederikshavn, where it will be recycled.

The Veslefrikk B arrived at the M.A.R.S quayside on Wednesday, August 31, 2022.

The platform, which has a total weight of approximately 26 000 tonnes, was originally built as a drilling rig but was later converted to a production platform. 

The platform, in the North Sea offshore Norway, started production in 1989 and was Equinor’s first floating production unit. It produced more than 400 million barrels of oil equivalent before it was removed from the field

The field was developed with two facilities, Veslefrikk A and Veslefrikk B. Veslefrikk A is a fixed steel wellhead facility and was connected by a to Veslefrikk B, a semi-submersible facility for processing and accommodation.

Equinor in 2021 awarded contracts for the removal, dismantling, and recycling work related to Veslefrikk platforms to M.A.R.S,  Aker Solutions, and Heerema Marine Contractors.

M.A.R.S last year said that Vesslefrik B work was expected to employ around 60 people at peak.

 



Categories: Energy Activity Europe Engineering Industry News Decommissioning Recycling

Related Stories

NSTA Names 13 Operators Falling Behind Decom Obligations in North Sea

Subsea7 Hooks Decom Work with Ithaca Energy off UK

DeepOcean Rounding Up Gryphon Alpha FPSO Decom Job

Current News

NEO NEXT+ Rises as UK’s Largest Independent O&G Producer Under New Merger

Harbour Energy to Sell Stakes in Indonesian Assets to Prime Group for $215M

U.S. Oil Production Still has Growth Potential

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

Subscribe for OE Digital E‑News