Malaysia: Shell to Develop Timi Field with Solar, Wind-powered Platform

OE Staff
Monday, August 30, 2021

Shell's Malaysian subsidiary Sarawak Shell Berhad has made a final investment decision (FID) on the Timi gas development, offshore Sarawak, in Malaysia. 

The Timi development will feature Shell Sarawak Berhad's first wellhead platform in Malaysia that is powered by a solar and wind hybrid renewable power system. 

"This unmanned platform is approximately 60%  lighter than a conventional Tender Assisted Drilling (TAD) wellhead platform. This project also includes the drilling of two wells," Shell said.

The Timi development is designed to reach up to 50,000 barrels of oil equivalent per day (boe/d) peak production and will evacuate its gas to the F23 production hub via an 80 km pipeline while supporting the future growth in the central Luconia area, off the coast of Sarawak.

Located at around 252 km north-west of Bintulu, Sarawak, Timi is a sweet gas field discovered in 2018 under the SK318 PSC. It will have a new unmanned wellhead platform (WHP) tied back to the existing Shell-operated F23 hub platform via a new 80km pipeline.

Categories: Production Asia Decarbonization

Related Stories

TotalEnergies to Review 2050 Net-Zero Targets as Energy Transition Slows

Strohm to Supply Insulated TCP Jumpers for Malaysia’s Offshore Project

Serica Posts 50% Profit Drop Due to Triton FPSO Downtime

Current News

Tenaris Expands Canada Footprint with AllTorque Acquisition Deal

UK Unveils Plans for 2027 Offshore Wind Leasing Round

TotalEnergies to Review 2050 Net-Zero Targets as Energy Transition Slows

Asian Buyers Rush for Russian Oil Amid Supply Disruption

Subscribe for OE Digital E‑News