Eni Brings Online Cuica Field Offshore Angola

OE Staff
Monday, August 16, 2021

Italian oil firm Eni said Friday it had recently started production from the Cuica field offshore Angola. The company is producing oil from the field via the Armada Olombendo FPSO.

Production started on July 30, 2021, just over 4 months from discovery. To remind, when it first announced the discovery, Eni said the field would be developed within a six-month period.

The Cuica field was discovered by the exploration well Cuica 1 in March 2021. It is located in a water depth of 500 meters, some three kilometers from the Armada Olombendo FPSO. 

The Armada Olombendo FPSO has a production capacity of 100,000 barrels of oil per day. Apart from Cuica, the FPSO is now receiving and treating the production of Cabaça, Cabaça South East, and UM8 fields for a total of 12 wells and 5 manifolds at a water depth ranging from 400 to 500 meters. The Olombendo FPSO will also receive production from the Cabaça North field in 4Q 2021.

The Cuica field is located in Block 15/06 which is operated by Eni Angola with a 36.84% share. Sonangol Pesquisa e Produção (36.84%) and SSI Fifteen Limited (26.32%) compose the rest of the Joint Venture.  

Categories: Energy Activity FPSO Production Floating Production

Related Stories

TotalEnergies Selects SLB for Global Digital Drilling Program

Petrobras Picks TechnipFMC for Flexible Flowlines Delivery off Brazil

Sumitomo, TFI Marine Introduce Mooring Solutions to Floating Wind

Current News

Shell to Take 30% Stake in Equinor's Bay du Nord Project off Canada

Transocean Adds $1.1B to Offshore Drilling Backlog

Gennaker Offshore Substations Depart for Baltic Sea Installation (Video)

Valeura Starts Wassana Platform Installation Offshore Thailand

Subscribe for OE Digital E‑News