MSS Wins Libra Consortium Contract in Brazil

OEDigital
Monday, June 21, 2021

Maersk Supply Service reports winning a solutions project contract for the Libra Consortium in Brazil for the pre-lay of anchors to a newbuild FPSO in Brazil, a project integrating engineering, procurement, construction and installation (EPCI) with offshore execution to be carried out in 2021 and 2022.

“With this contract, we will be ramping up our activities in Brazil significantly and will be developing further our office in Rio de Janeiro. We look forward to working closely with Petrobras as the lead operator for Libra Consortium,” dsif Rafael Thome, Managing Director for Maersk Supply Service in Latin America.

Maersk Supply Service is contracted by the Libra Consortium, comprising of Petrobras (Operator, with 40%), Shell Brasil (20%), TotalEnergies (20%), CNODC (10%) and CNOOC Limited (10%). The Consortium also has the participation of the Pré-Sal Petróleo S.A.(PPSA) as the manager of the Production Sharing Contract. The work consists of pre-laying 24 torpedo anchors, each weighing 120 tonnes and 23 metres long, on 2.000 metres of water depth offshore Rio De Janeiro, Brazil, at the Mero 2 Project, and Maersk Supply Service will be responsible for all activities from engineering, procurement and offshore execution.

Photo courtesy Maersk Supply Service

Categories: Activity FPSO Brazil Contracts

Related Stories

Gasunie to Charter New Fortress Energy FSRU to Reduce Dutch Reliance on Russian Gas

Kongsberg to Provide Electrical and Control Equipment for Yinson FPSO

ConocoPhillips Files Development Plan for Offshore Oil Field in Norway

Current News

Incident with Gas Cooler Cracks on Equinor's Troll C Platform Could've Caused a Major Gas Leak, PSA Says

Weatherford CFO Jennings to Leave in July

Vantage Drilling's Q1 Loss Narrows. Sale of Jack-up Rig Trio to ADES to Close in Q2

DOF Wins $260M in AHTS, ROV Deals with Petrobras in Brazil

Subscribe for OE Digital E‑News