CNOOC Starts Production from Caofeidian 6-4 Offshore Oil Field

Monday, March 15, 2021

China's CNOOC on Monday said it had started production from the Caofeidian 6-4 offshore oil field in the Bohai bay, China.

The Caofeidian 6-4 oilfield is located in the Midwest of Bohai, with an average water depth of about 20 meters. 

"In addition to fully utilizing the existing processing facilities of Nanpu 35-2 oilfield and Qinhuangdao 32-6 oilfield, the project has built a new central platform," CNOOC said.

A total of 42 development wells are planned, including 30 production wells, 12 water injection wells and water source wells. The project is expected to reach its peak production of approximately 15,000 barrels of crude oil per day in 2023.

"Guided by the vision of green development, Caofeidian 6-4 oilfield will actively promote green and low-carbon production. After putting into production, the project will achieve zero discharge of production and living sewage into the sea," CNOOC said.

Furthermore, CNOOC said that with the introduction of onshore power engineering, it is estimated that about 16,000 tons of standard coal will be saved, and about 40,000 tons of carbon dioxide will be reduced annually. CNOOC Limited holds a 100% interest in Caofeidian 6-4 oilfield and acts as the operator.


Categories: Production Asia Shallow Water Bohai Bay

Related Stories

Petrobras Discovers Hydrocarbons in Ultra-Deep Waters Off Amapá

TGS and GTI Collaborate on Seismic Acquisition

ConocoPhillips, CNOOC Put Penglai Field off China Into Full Operation

Current News

Equinor Acquires Stake in Namibian Offshore Exploration License

Geir Håøy Appointed to MacArtney Board of Directors

deugro Delivers 110 Kilometers of Subsea Cables for Saudi Installation Project

SeaDry Protects Offshore Instrumentation From Humidity

Subscribe for OE Digital E‑News