Japan's JX Nippon Taps KBR for CCS, Hydrogen Study

Wednesday, May 13, 2020

U.S. engineering and construction giant KBR has been awarded a contract for Carbon Capture and Sequestration works at JX Nippon's offshore oil and gas fields in South East Asia.

Under a Master Service Agreement (MSA) and Feasibility Study awarded to KBR by Japan-based oil and gas company JX Nippon, KBR will assess options for Carbon Capture and Sequestration (CCS), alongside blue hydrogen production relating to oil and gas fields in South East Asia.

KBR will provide technical consultancy services in relation to developing concepts and technology recommendations for the capture of CO2, reinjection, and production of blue (i.e. carbon-free) hydrogen.

KBR will also evaluate the feasibility of conversion and transport of hydrogen in other forms for sale into the market, including liquified cryogenic hydrogen, liquid organic hydrogen carrier (LOHC), ammonia, and methanol (utilizing CO2).

This project will be led primarily from KBR's consulting hub in Singapore and will include KBR's cryogenic hydrogen team which works with NASA extensively on the storage, training and safe handling of hydrogen at extreme temperatures.

JX Nippon has previously signed an agreement with Japan Oil, Gas and Metals National Corporation and Petronas to study the development of high CO2 gas fields in Malaysia, utilizing Carbon Capture and Storage (CCS) technology, with a plan for the CO2 produced from the fields to be separated, captured and injected into suitable storage reservoirs such as mature and depleted gas reservoirs.

Japan's JX owns an operating interest in Helang and Layang Gas fields offshore Sarawak, Malaysia.

Categories: Energy Asia Hydrogen Malaysia Decarbonization

Related Stories

ADNOC, XRG and Mitsui Broaden Energy Cooperation

Ruwais LNG Commitments Top 90% Capacity with New INPEX Deal

Saipem Lands $2B FPSO Deal for Offshore Gas Field in Indonesia

Current News

ECIT Global Launches New Suite of Safety Courses

From Fixtures to Values: Where the Jackup Recovery Is Already Being Priced

Hill v. Jackson Offshore and the Delegation Clause

NextFloat Floating Wind Pilot Clears Key Spanish Regulatory Hurdle

Subscribe for OE Digital E‑News