Equinor to Shut Hammerfest LNG Plant for Two Weeks in May

Nerijus Adomaitis
Wednesday, May 6, 2020

Equinor will shut down its Melkoyea liquefied natural gas (LNG) plant for two weeks of maintenance in the second half of May, the Norwegian oil and gas company said on Wednesday.

The shutdown of the plant, also called Hammerfest LNG, which liquefies natural gas from Equinor's Arctic Snoehvit field for export to the global market by tankers, will reduce production by 18 million cubic metres per day.

The company said the maintenance was a planned event, but it also comes at a time when demand is depressed amid coronavirus-related lockdown.

Equinor has a 36.8% stake in the Snoehvit field and the LNG plant. Its partners are Petoro with 30%, Total with 18.4%, Neptune Energy with 12% and Wintershall Dea with 2.8%. 

(Reporting by Nerijus Adomaitis, editing by Terje Solsvik)

Categories: Energy LNG Activity Arctic Inspection & Repair & Maintenance Barents Sea

Related Stories

Equinor Drills Dry Well in Barents Sea

DOF Group ASA Awarded Contract in Argentina

Mubadala Hires SLB for Deepwater Drilling Services Offshore Indonesia

Current News

Ndungu Full-Field Starts Up Offshore Angola

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

AKOFS Offshore Inks New Vessel Deal with Petrobras

UK Trade Body Challenges Government View on North Sea Gas Decline

Subscribe for OE Digital E‑News