Equinor Gets Another Consent for Troll B Life Extension

OE Staff
Monday, April 20, 2020
Troll B has produced more than one billion barrels of oil. Planning is now under way for another ten years of value creation. (Photo: Equinor/Øyvind Hagen)

After receiving consent from the Petroleum Safety Authority Norway for the extended operation of the Troll B offshore platform, oil firm Equinor has now received the green light from the Norwegian Petroleum Directorate, too.

The authorities have now granted consent to Equinor for a 10-year lifetime extension for the Troll B platform in the North Sea.

The extended lifetime for Troll B also includes pipelines for oil and gas that were part of the basis in connection with approval of the Plan for Development and Operation (PDO). The current consent expires in September 2020. The Troll B was brought online in September 1995.

The extension of Troll B’s lifetime to 2030 is one of the potential solutions for further developing gas production from the Troll Vest gas cap, Troll phase three, the Norwegian Petroleum Directorate said Monday.

Nine seismic surveys have been carried out on the Troll field, with the last one completed last summer, it added.

All previous surveys have contributed to identifying new well targets. The licensees expect the results from processing the data from the latest seismic survey will yield additional well targets. These can be drilled from the subsea templates tied to Troll B, the oil regulator said.

“Extended operation of Troll B secures a foundation for good resource management of significant oil and gas resources from the gigantic Troll field,” says Arvid Østhus, Assistant director Development and operations, North Sea in the NPD.

The Petroleum Safety Authority has also approved extended operation and believes that Troll B can be operated safely until the end of the licence period, based on an assessment of current technical integrity. This requires maintenance and modifications according to the lifetime extension plan.

Categories: Energy Industry News Activity Europe Production

Related Stories

Triton Completes MacGregor Acquisition

Triton Completes MacGregor Acquisition

First Spanish-Built Jackets Set Sail for French Offshore Wind Farm

First Spanish-Built Jackets Set Sail for French Offshore Wind Farm

Serica Energy Revises Production Outlook as Triton FPSO Ramp-Up Lags

Serica Energy Revises Production Outlook as Triton FPSO Ramp-Up Lags

Current News

SLB Acquires Well Intervention Software Specialist

DOF Scoops Over $220M for AHTS Vessel Contracts with Petrobras

Record Production Boosts Chevron’s Second Quarter Earnings

ExxonMobil’s Profit Shoots Above Expectations

Subscribe for OE Digital E‑News

Offshore Engineer Magazine