Wärtsilä Power Solution for Normally Unattended Installations

Tuesday, May 28, 2019


Offshore platforms designed to be able to operate for up to six months without the need for scheduled maintenance rely on a holistic power-generation concept from Wärtsilä that leverages high efficiency engines remote monitoring, predictive maintenance and OEM experience and expertise.

Categories: Technology Production

Related Stories

Equinor’s Johan Castberg Field Starts Producing at Peak Capacity

Equinor’s Johan Castberg Field Starts Producing at Peak Capacity

ENEOS Gets Extension for Gas Block off Malaysia

ENEOS Gets Extension for Gas Block off Malaysia

From Swamp Rigs to Floating Wind: Calvin Norton Reflects on 60 Years of Offshore Engineering

From Swamp Rigs to Floating Wind: Calvin Norton Reflects on 60 Years of Offshore Engineering

Current News

Seequent Receives Award at Global Offshore Wind 2025, Hosts Upcoming Webinar

Libya Blocks Greek Tender for Hydrocarbon Exploration Off Crete

Russia Looks to Myanmar Offshore Oil and Gas Prospects

TotalEnergies’ Offshore Platform Workers in UK Secure Better Conditions

Subscribe for OE Digital E‑News

Offshore Engineer Magazine