Energean: First Oil from Epsilon ERW

Monday, April 8, 2019

Mediterranean focused oil and gas producer Energean announced Monday it has completed drilling operations and began producing from the extended reach well EA-H3 offshore Greece in the Mediterranean Sea.

The well was brought into production on April 1 and is currently producing at a stable dry oil rate of more than 1,000 bopd on a restricted choke, the UK listed company said in a press release.

The well was drilled  using the company-owned drilling rig, the Energean Force, to a total measured depth of 5,679 meters and has penetrated 689 meters of the Epsilon sandstone reservoir, in line with pre-drill expectations.

Energean said it will continue to monitor and fine-tune production parameters to ensure optimal production from the well.

(Image: Energean)

Categories: Drilling Activity Production Completions

Related Stories

North Sea Pilot Produces Green Hydrogen on Operational Offshore Platform

Equinor Finds Oil Near Johan Castberg Field in Barents Sea

INA Completes First Well in Adriatic Sea Drilling Campaign off Croatia

Current News

Germany’s Uniper Inks 20-Year Canada LNG Supply Deal

Energean, Carlyle Eye BP's Egypt Offshore Gas Assets

TGS Books Fresh OBN Survey Job

Allseas to Install Key Piece of Subsea Pipeline for Canadian LNG Project

Subscribe for OE Digital E‑News