Dong to deliver Anholt

OE Staff
Monday, August 9, 2010

The Danish Energy Agency recently awarded Dong Energy the concession to build an offshore wind farm in the Kattegat Bay at a cost of DKK10 billion. The wind farm's turbines, supplied by Siemens Wind Power, will have a capacity of 3.6MW each. To be located off the island of Anholt, the facility will have a capacity of 400MW, reckoned to be sufficient to meet 4% of Denmark's power consumption.

Tender specifications dictate that the wind farm must supply its first power by late 2012, with the entire facility commissioned and all turbines connected to the grid by the end of 2013.

Failure to meet the specifications will result in reduced tariff income and a penalty.

Dong commissioned Horns Rev 2 in the Danish North Sea in 2009 and has just inaugurated the UK's Gunfleet Sands 1+2 wind farm in the Thames Estuary. OE

Categories: Europe Renewables

Related Stories

Transocean Secures $158M Drillship Job in Eastern Mediterranean

North Star Bolsters Leadership Team to Support Offshore Wind Growth

RWE Installs First Recyclable-Blade Turbine at Danish Offshore Wind Farm

Current News

Astro Offshore Expands Subsea Capability with New MPSV

Petrobras Takes Operatorship of Offshore Block in Central Africa

TGS to Advance Offshore Seismic Development In Equatorial Guinea

ADES Boosts Backlog with Several Drilling Rig Deals off Nigeria

Subscribe for OE Digital E‑News