Seismic vessels notation

OE Staff
Saturday, November 10, 2012

The need for enhanced redundancy and proper deck arrangements to ensure continuous operation of seismic vessels without loss of speed is the backbone of new technical requirements developed by DNV in consultation with key industry players such as WesternGeco, PGS and Fugro-Geoteam.

With its high-end computerised technology, sudden loss of service speed may damage a seismic vessel’s cables, causing complications in seismic data processing. DNV’s new notation, released this summer, focuses on the increased availability of the vessels during critical phases of seismic operations. The key issue is maintenance of propulsive power. The class notation has taken the DNV concept for redundant propulsion one step further so that any failure onboard will not lead to loss of more than 50% forward trust. This rate is sufficient to maintain a minimum speed of a few knots, which will protect any deployed air guns and streamers.

Seismic vessels typically operate for many months continuously without seeking harbour. The class notation requires a deck arrangement that facilitates side-by-side transfer for crew and resupply from a seismic support vessel. Beyond this, the class notation also sets a requirement for the bridge arrangement to ensure good view to the streamers and any workboats that are close by during normal operation. High-pressure systems are also addressed in the class notation to ensure the crew can safely carry out deck operations.

Categories: Products Vessels Geoscience Geophysics

Related Stories

Emerson Launches WirelessHART Non-Contacting Radar Level Transmitter

Emerson Launches WirelessHART Non-Contacting Radar Level Transmitter

Unique Group Scores Multi-Million-Dollar LARS Supply Deal

Unique Group Scores Multi-Million-Dollar LARS Supply Deal

Petrobras, SBM Discuss Two FPSO Vessels for Sergipe Deepwater Projects

Petrobras, SBM Discuss Two FPSO Vessels for Sergipe Deepwater Projects

Current News

Chevron Looks to Expand West African Acreage After Guinea-Bissau Deal

Seatrium Divests Non-Core Platform Supply Vessels For $59.7m

THREE60 Energy Acquires Total Vision

ABL to Support Platform Installations, Rig Moves for Chevron in Gulf of Thailand

Subscribe for OE Digital E‑News

Offshore Engineer Magazine