FPSO Cidade de Paraty beginning production from the Lula Nordeste field

OE Staff
Wednesday, July 10, 2013

Cidade de Paraty in production

FPSO Cidade de Paraty went on stream, beginning production from the Lula Nordeste field in the Santos Basin presalt play. It is about 300km off Brazil, in the northeast corner of Block BM-S-11.

The FPSO can process up to 120,000bo/d and 5MMcm/d of gas. Petrobras, operator, said the first well (7-LL-11-RJS) to be connected to the platform has the potential to produce 25,000b/d, but it will be restricted to 13,000b/d during the first month as processing and reinjection systems are commissioned. Petrobras will connect another seven production wells and six injection wells. Peak production, 120,000 b/d, is expected for 2H 2014.

Categories: Activity FPSO Production South America

Related Stories

Eni's Venezuela Expansion Opens Path to Recover $2.3B Debt

Floatel Triumph Lined Up for Brazil MSU Work

Omega Subsea Sets Up New Operation Base in Western Norway

Current News

OneSubsea To Supply Umbilicals for Azule Energy’s Project off Angola

Windward Offshore Completes Four-Vessel Vard-Built CSOV Fleet (Video)

Europe’s Largest Industrial Carbon Capture Facility Opens in Netherlands

Petronas Turns to AI to Accelerate Upstream Investment

Subscribe for OE Digital E‑News