FPSO Cidade de Paraty beginning production from the Lula Nordeste field

OE Staff
Wednesday, July 10, 2013

Cidade de Paraty in production

FPSO Cidade de Paraty went on stream, beginning production from the Lula Nordeste field in the Santos Basin presalt play. It is about 300km off Brazil, in the northeast corner of Block BM-S-11.

The FPSO can process up to 120,000bo/d and 5MMcm/d of gas. Petrobras, operator, said the first well (7-LL-11-RJS) to be connected to the platform has the potential to produce 25,000b/d, but it will be restricted to 13,000b/d during the first month as processing and reinjection systems are commissioned. Petrobras will connect another seven production wells and six injection wells. Peak production, 120,000 b/d, is expected for 2H 2014.

Categories: Activity FPSO Production South America

Related Stories

Siemens Gamesa Discusses European Production With Chinese Rare Earth Suppliers

Siemens Gamesa Discusses European Production With Chinese Rare Earth Suppliers

Aker BP Installs New Jacket at Valhall Field in Southern North Sea (Video)

Aker BP Installs New Jacket at Valhall Field in Southern North Sea (Video)

Prosafe Confirms $204M Deal with Petrobras for Safe Notos Flotel

Prosafe Confirms $204M Deal with Petrobras for Safe Notos Flotel

Current News

Siemens Gamesa Discusses European Production With Chinese Rare Earth Suppliers

Sierra Leone Awaits Results of Offshore Seismic Survey Ahead of Possible Oil and Gas Auction

Bernhard Schulte Offshore Delivers New Commissioning Service Operation Vessel

OSC, Ashtead Technology Bolster Joint Environmental Services Offer

Subscribe for OE Digital E‑News

Offshore Engineer Magazine