FPSO Cidade de Paraty beginning production from the Lula Nordeste field

OE Staff
Wednesday, July 10, 2013

Cidade de Paraty in production

FPSO Cidade de Paraty went on stream, beginning production from the Lula Nordeste field in the Santos Basin presalt play. It is about 300km off Brazil, in the northeast corner of Block BM-S-11.

The FPSO can process up to 120,000bo/d and 5MMcm/d of gas. Petrobras, operator, said the first well (7-LL-11-RJS) to be connected to the platform has the potential to produce 25,000b/d, but it will be restricted to 13,000b/d during the first month as processing and reinjection systems are commissioned. Petrobras will connect another seven production wells and six injection wells. Peak production, 120,000 b/d, is expected for 2H 2014.

Categories: Activity FPSO Production South America

Related Stories

RINA Secures $12.3M Subsea Engineering and Decom Work for Petrobras

New Fortress Energy Strikes US Power Deal, Keeps FLNG Restart Target

Production Restart at Australian Offshore Fields Boosts Jadestone's Oil Output

Current News

Meyer Werft Establishes Organizational, Legal Framework for Offshore Converter Business

CM Energy to Supply Cable Lay Equipment for Asso.subsea Vessel

Sub-Saharan Africa: The Majors’ Next Wave of Growth

Worley Lands EPC Contract for Venture Global's CP2 LNG Expansion

Subscribe for OE Digital E‑News