FPSO Cidade de Paraty beginning production from the Lula Nordeste field

OE Staff
Wednesday, July 10, 2013

Cidade de Paraty in production

FPSO Cidade de Paraty went on stream, beginning production from the Lula Nordeste field in the Santos Basin presalt play. It is about 300km off Brazil, in the northeast corner of Block BM-S-11.

The FPSO can process up to 120,000bo/d and 5MMcm/d of gas. Petrobras, operator, said the first well (7-LL-11-RJS) to be connected to the platform has the potential to produce 25,000b/d, but it will be restricted to 13,000b/d during the first month as processing and reinjection systems are commissioned. Petrobras will connect another seven production wells and six injection wells. Peak production, 120,000 b/d, is expected for 2H 2014.

Categories: Activity FPSO Production South America

Related Stories

Petrobras Buys Back Petronas Stake in Two Brazil Offshore Fields

Subsea7 Nets Over $1.2M for Work at Petrobras’ Sépia 2 off Brazil

Brazil Court Lifts Export Tax for Select Oil Firms

Current News

Turkey Launches Deep Sea Drilling Mission in Somalia

OMV Nominates BP Executive Emma Delaney as Next CEO

Petrobras Buys Back Petronas Stake in Two Brazil Offshore Fields

OneSubsea to Supply Production Boosting System for Shenandoah Field

Subscribe for OE Digital E‑News