Höegh selected for FLNG FEED

OE Staff
Thursday, August 22, 2013

Höegh LNG has signed a contract with an Asia based national oil company to conduct pre-front-end engineering design (FEED) engineering work for an offshore floating LNG facility (FLNG) with a two million-tonne per annum production capacity. 

The work will be finalised in the first quarter of 2014. Provided that the conclusion of the engineering work is positive, the intention of the client is to execute a full FEED in the first half of 2014.

In July, Höegh FLNG, a fully owned subsidiary of Höegh LNG, was awarded a pre-FEED study for a jetty-moored 2 mtpa FLNG near shore barge FLNG solution for a North American LNG export project. The study will be executed in 2H 2013 with a potential for conducting a full FEED in 2014.

Categories: LNG FPSO Asia Natural Gas FLNG

Related Stories

Woodside Finds South Korean Partners to Advance LNG Value Chain

Woodside Finds South Korean Partners to Advance LNG Value Chain

Equinor Hires Aker Solutions for Norwegian Oil and Gas Tie-In Scheme

Equinor Hires Aker Solutions for Norwegian Oil and Gas Tie-In Scheme

Gastech 2025 Technical & Commercial Conference to Accelerate Global Growth and Decarbonisation Through Energy Innovation

Gastech 2025 Technical & Commercial Conference to Accelerate Global Growth and Decarbonisation Through Energy Innovation

Current News

Lloyd's Register Study Identifies Hidden Fatigue Risks in Offshore Wind Tech

Ventyr Enlists DNV to Certify Norway’s First Offshore Wind Farm

Australian Engineering Firm Gets Work on Shell’s Crux Gas Platform

Clean Power Starts Flowing from China’s Furthermost Offshore Wind Project

Subscribe for OE Digital E‑News

Offshore Engineer Magazine