GMC wins Moho Nord work

OE Staff
Thursday, October 17, 2013

Houston-based GMC Inc. has been awarded a contract to deliver its high strength fatigue resistant mechanical connector product as part of Total’s Republic of Congo Moho Nord TLP project.  GMC will supply over a hundred sets of its concentric thread, pin and box type connectors under contract to Hutchinson Offshore’s Techlam S.A. who are supplying the entire TLP tendon system to Hyundai Heavy Industries. 

The 16,500-ton TLP hull and topsides will be vertically moored in over 780m water depth by the tendon tethering system. GMC’s high strength fatigue resistant mechanical connector will provide the intermediary connectors on the tendons. The 24in. OD connectors will have a tension capacity rated at over 2000 tons. The scope of supply includes the connectors, the make and break tool, and a tendon handling tool. GMC technicians will support Heerema on the tendon installation.

Categories: Africa

Related Stories

Deepsea Mira Semi-Sub Up for Shell’s Drilling Job off Namibia

Viridien Set for Seismic Reimaging of Block 22 Offshore Angola

Chevron Eyes New Nigeria Oil Blocks Aiming for Late-2026 Rig Arrival

Current News

BOEM Initiates Process for Potential Mineral Lease Sale Offshore Virginia

Jumbo Scoops Two Offshore Wind Contracts

Wood Nets Long-Term Maintenance Contract for Rio Grande LNG Facility

TechnipFMC to Supply Subsea Systems for Chevron’s Gas Project off Australia

Subscribe for OE Digital E‑News