RDS inked for Sea Lion study

Tuesday, September 2, 2014

Rig design and engineering firm RDS has been awarded a front-end engineering design (FEED) contract by AMEC for Premier Oil’s Sea Lion development in the North Falklands Basin.

The FEED work is part of AMEC’s overall FEED contract for the Sea Lion development and follows a concept study which was executed by an RDS team in Houston.

The contract, which is expected to be carried out over the next 12 months, will see RDS deliver the design of drilling rig modules for a tension leg platform (TLP), 200km north of the Falkland Islands.

The overall project is being delivered from AMEC’s London design office, supported by KCA Deutag in London and Houston Offshore Engineering in Houston.   

Simon Drew, President of RDS said: “The Sea Lion field will be the first major development of oil and gas reserves in the Falklands. Due to its remote location, we need to ensure that we deliver a rig that is reliable, efficient and can be easily maintained and supported to deliver safe, effective operations.”

RDS is a subsidiary of KCA Deutag. “RDS and KCA Deutag have a lot of experience in designing and operating rigs in remote locations and this is a great opportunity to put that experience to good use in a new region. We look forward to continuing to work closely with Premier Oil and AMEC as we move the Sea Lion development forward,” Simon added.

The TLP will contain drilling, topsides wells, processing facilities, utilities and quarters. The design life of the production facilities is estimated at around 25 years.

 
Categories: Drilling Engineering Europe Rigs Platform

Related Stories

OMV Petrom’s Black Sea Well Fails to Find Significant Gas Volumes

Borr Drilling Secures New Drilling Rig Contracts Across Four Regions

Reach Subsea Secures Equinor Contracts for Uncrewed Vessel Operations

Current News

OMV Petrom’s Black Sea Well Fails to Find Significant Gas Volumes

Eco Wave Power Completes Los Angeles Wave Energy Pilot with Shell

Borr Drilling Secures New Drilling Rig Contracts Across Four Regions

BP, ADNOC JV Takes FID on Harmattan Gas Project off Egypt

Subscribe for OE Digital E‑News