FloaTEC Singapore Pte Ltd. mates Petrobras P-61

OE Staff
Wednesday, July 10, 2013

FloaTEC mates P-61 modules

FloaTEC Singapore Pte Ltd. mated the topsides and hull of Petrobras P-61, Brazil’s first tension-leg wellhead platform (TLWP) near the BrasFELS yard in Angra dos Reis, southern Rio de Janeiro state, Brazil. The P-61 TLWP will be installed later this year at the Papa Terra heavy oil field for Papa Terra BV- a joint venture company formed by Petrobras and Chevron.

Categories: Activity South America Installation

Related Stories

Suriname, Guyana Plan Cross-Border Team for Join Gas Projects

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Petrobras’ P-79 FPSO Arrives to Brazil to Support Búzios Growth Plan

Current News

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

AKOFS Offshore Inks New Vessel Deal with Petrobras

UK Trade Body Challenges Government View on North Sea Gas Decline

Inpex Secures Environmental Approval for Indonesia’s Abadi LNG Project

Subscribe for OE Digital E‑News