Huisman Building Drilling System for CMHI

Posted by Michelle Howard
Friday, September 14, 2018

This week, China Merchants Heavy Industries (CMHI) awarded Huisman a contract for the engineering and fabrication of a drilling system which will be integrated and installed on the moored drilling semi-submersible constructed at CMHI Haimen.

This drilling system will be used for oil and gas drilling activities in shallow to medium water depths all around Asia, particularly the South China Sea.

The contract is a result of a constructive cooperation between CMHI and Huisman during the semi’s concept design. The drilling system comprises an 1800kips static rated load Dual Multi Purpose Drilling Tower (DMPT), a single pipe setback drum,  innovative manipulator arms for pipe and tool handling, top drive, iron roughnecks, skid carts, catwalk machines, gantry and deck cranes, drillers cabins and Huisman’s fully integrated control system.

The Dual Multi Purpose Tower (DMPT) will be delivered in the second quarter of 2020 to CMHI Jiangsu Yard in China. Fabrication and final commissioning of the completed DMPT will take place at Huisman China.

Categories: Offshore Energy Drilling Engineering Subsea Offshore Contracts

Related Stories

TMC, Allseas Ink Deal for First Commercial Deep-Sea Nodule Recovery System

NextGeo Scores $11.7M Mediterranean Subsea Job

Siemens Energy Delivers All 14 Transformers for UK-Germany Energy Link

Current News

Seraya Partners Considers Sale, IPO for Offshore Wind Firm Cyan Renewables

ScioSense Launches UFC23 Ultrasonic Flow Converter for High-Precision, Ultra-Low-Power Smart Metering

All Systems Go for Technip Energies' Job at Commonwealth LNG Scheme

Ocean Winds Gets Full Onshore Approval for Caledonia OW Project

Subscribe for OE Digital E‑News