Offshore FPSO News - page 153


The complexities of Marlim Sul

Jun 10, 2010

Brazilian operator Petrobras expects to initiate production from a new reservoir to existing facilities in Modules 1 and 2 of its deepwater Marlim Sul field this summer and bring a third module onstream via the P-56 semi early next year. Asset…

X factor drilling in the fast lane

May 20, 2010

In 2007, OGX was but a dream of Brazilian entrepreneur Eike Batista. In the course of three short years, the company secured financing for leases, bid on and won shallow water blocks, secured drilling rigs, hired about 150 staff, tallied six…

Papa Terra makes the most of family ties

May 20, 2010

When the P-61 tension leg wellhead platform (TLWP) begins operations at Petrobras' Papa Terra offshore Brazil in 2013, it will be the new kid on the block in more ways than one. Not only will the deepwater unit be the first TLWP facility off Brazil…

Poetry in motion

Mar 04, 2010

Banking on customer desire for a round floater that offers drilling, storage, and/or production along with dry tree capabilities, SSP Offshore has made its SSP320+ Plus design ready for the market. Jennifer Pallanich looks at the latest refinements…

Current News

Panoro to Bid in Equatorial Guinea Oil and Gas Auction after Block G Boost

US DOE Green Light Set to Make Corpus Christi Second Largest US LNG Scheme

TotalEnergies Eyes Long-Term LNG Supply from Alaska LNG Project

Fugro’s CFO Steps Down

Subscribe for OE Digital E‑News