Cadeler has taken delivery of Wind Ace, its 11th offshore wind turbine installation vessel (WTIV) and the second of three A-class newbuilds.Built over the past two years at the COSCO Shipping Offshore shipyard in Qidong, China, the vessel was delivered on schedule and within budget, according to Cadeler.Following mobilization, Wind Ace will prepare for deployment on ScottishPower Renewables' 960 MW East Anglia TWO offshore wind farm in the UK…
Cadeler completed the final turbine installation at the 960 MW He Dreiht Offshore Wind Farm in the German North Sea. The final turbines were installed by Wind Keeper, under its long-term contract with Vestas.Cadeler’s scope of the installation…
GustoMSC, NOV’s offshore design and engineering business, has developed a new asymmetrical rack-and-pinion technology designed to increase the jacking capacity of offshore wind installation vessels without increasing vessel size, weight or system complexity…