Gate wins Leviathan commissioning

Noble Energy has chosen Gate Energy to provide facility commissioning for the Leviathan platform offshore Israel.

The scope includes topside commissioning planning, onshore commissioning execution and offshore commissioning services of the production platform.

Leviathan is a natural gas mega-project offshore Israel with first gas targeted for the end of 2019. Noble Energy is the operator of the Leviathan field, which contains approximately 22 Tcf of gross recoverable resources.

 

Current News

Petrobras Signs Contracts with Perenco for Sale of Two Campos Basin Fields

Petrobras Signs Contracts with

Equinor Upbeat About Investor Interest in US Offshore Wind Farm

Equinor Upbeat About Investor

GE Vernova Could Not Agree Turbines Switch on NY Wind Projects

GE Vernova Could Not Agree Tur

Hess Profit Jumps on Guyana Output in Positive Sign for Exxon

Hess Profit Jumps on Guyana Ou

Subscribe for OE Digital E‑News

Offshore Engineer Magazine