Petronas PFLNG1 construction at 95%

Published

The Petronas floating LNG1 (PFLNG1) has reached a 95% overall progress in its construction and will come onstream in 2016, the company said.

In late September, Petronas began lifting the first topside module for its PFLNG1 facility at the Daewoo Shipbuilding and Marine Engineering (DSME) shipyard in Okpo, South Korea. 

The topside module lifting marks another major construction milestone for the facility, as it signifies the near completion of the PFLNG1, which will be the world’s first floating LNG facility in operation.

Once the construction and installation phases are completed in 2015, PFLNG1 will be moored in Kanowit field, which is about 180km offshore Sarawak, Malaysia.

Read more:

Technip wins PFLNG1 tieback work

Current News

The Business of Offshore CO₂ Storage: A New Market for Maritime Infrastructure

The Business of Offshore CO₂ S

Strohm Nets Ultra-Deepwater Supply Deal for Southeast Asia’s Gas Scheme

Strohm Nets Ultra-Deepwater Su

Damaged Tanker Leaks Oil Across UAE Waters as Spill Widens

Damaged Tanker Leaks Oil Acros

TotalEnergies Takes 25% Stake in 26 Chevron-Operated US Offshore Blocks

TotalEnergies Takes 25% Stake

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine