Lundin Petroleum has started drilling exploration well 33/2-1 on the Storm prospect in production license 555 in the northern North Sea. The well is 200km west northwest of Florø on the Norwegian west coast and about 65km northwest of the Snorre field…
The rapid expansion of oil and gas telecommunications systems in order to facilitate the development digital oilfields in increasingly remote locations, enhance safety, and maximize data use, was the theme of a conference on oil and gas telecommunications organized by SMi Group in London…
There are currently 271 projects proposed or under development on the UK Continental Shelf (UKCS) and the Norwegian Continental Shelf (NCS) and a total potential investment of US$262.3 billion. These were among the topline figures according…
Statoil awarded Schlumberger Norway a contract to provide integrated drilling services and exploration drilling on the Norwegian continental shelf (NCS). Licenses are for Gullfaks, Gullfaks Satellites, Snorre, Statfjord, Tordis/Vigdis…
Norway’s Statoil is to keep its Snorre B platform shut in until an investigation finds the cause of a pit which formed at a subsea template. The pit, described as “an abnormal erosion of mass under the template” was discovered on Saturday (17 May)…
Work will continue this summer and autumn on installing a permanement seismic monitoring system on the Snorre field in the Norwegian sector of the North Sea. A dedicated system, with a seismic streamer, will also be installed on Grane…
Statoil has exercised a two-year contract extension with Altus Intervention for the provision of mechanical wireline services on Statoil-operated fields and mobile drilling units on the Norwegian continental shelf. The scope of the extended…
Norway’s state oil firm Petoro has said it wants to double the number of wells on the Norwegian Continental Shelf and halve their cost in order to realize the great potential of discoveries and existing fields in the Norwegian State’s Direct Financial Interest (SDFI) portfolio…
Production has started on the first new Statoil-operated platform on the Norwegian Continental Shelf since 2005. The Gudrun oil and gas field, in the Norwegian sector of the North Sea, is also the first new to be operated by Statoil from the Stavanger region since Sleipner in 1993…
Statoil is working to secure a well drilled from its Snorre A platform in the North Sea, after drilling fluid was lost during operations on Saturday night.Drilling fluid is used to maintain pressure in a well during drilling. Statoil…
FMC Technologies, Inc. has signed an agreement with Statoil for the manufacture and supply of a workover system (WOS) to be installed on the Snorre B platform. The award has an approximate value of US$114 million. The new WOS will replace…
Statoil recommends building a new drilling and processing platform on the Snorre field in the North Sea to maximize extraction of remaining reserves. Together with Petoro AS and the other license partners, Statoil says it has worked hard…
Aker Solutions ASA secured a two-year option agreement extension valued at NOK 3 billion from Statoil ASA to provide maintenance and modifications work offshore Norway. The option is part of a 2010 framework agreement to provide maintenance…
Statoil accepted an NKR 10MM (US$ 1.64MM) fine after it was ruled that in May 2011, the company improperly sent 180cu m of wash water with chemicals, or hazardous waste, from the Oseberg C platform to the Sture terminal. Statoil maintains…
CGG was awarded two contracts by Statoil ASA to provide long-term seismic imaging services for permanent reservoir monitoring (PRM) operations on the Snorre and Grane fields in the Norwegian sector of the North Sea. The scope of each contract also includes acquisition QC services…