First Subsea Wins Dutch Wind Farm Work

Published

First Subsea cable protection systems (CPS) for the Export Cables and Cross Over Protection for TenneT’s Net op zee Hollandse Kust (zuid) offshore wind farm. (Photo: First Subsea)
First Subsea cable protection systems (CPS) for the Export Cables and Cross Over Protection for TenneT’s Net op zee Hollandse Kust (zuid) offshore wind farm. (Photo: First Subsea)

First Subsea announced it has been selected by Van Oord / Cablel to supply cable protection systems (CPS) for the export cables and cross over protection for TenneT’s Net op zee Hollandse Kust (zuid) offshore wind farm located 20 kilometers off the coast of The Hague in the Netherlands.

First Subsea said it will engineer, test and supply a CPS for the protection of the 220 kV Export Cables and the 66 kV Interlink Cable between the J-tube at the offshore sub-stations, Alpha and Beta. The platforms shall be of a jacket design and J-tubes used to guide and protect the export cables entering the platforms. The export cables are protected by the CPS, which is  installed on top of the scour protection and trenched beyond the scour protection.

The CPS has been designed to ensure the power cables are protected against vortex induced vibrations, instability due to waves and currents, touchdown protection, edge scour and abrasion. In addition, it provides improved cable fatigue performance, optimized installation and simple disconnection should it be required.

The scope of work also includes crossing protection for four submarine power cables which will each cross three pipelines. A total of 12 pipeline crossings shall be supplied and installed by Van Oord / Cablel. The crossing designs consist of a CPS, which will be designed and supplied by First Subsea.

Current News

IKM Aconan to Deliver Drilling, Well Services for Vår Energi

IKM Aconan to Deliver Drilling

Unity Wins North Sea Decom Contracts, Expands Overseas

Unity Wins North Sea Decom Con

Denmark Receives Offshore Wind Bids as Tender Scheme Rebounds

Denmark Receives Offshore Wind

Borr Drilling’s First Quarter Profit Takes Hit as Odin Rig Start-Up Lags

Borr Drilling’s First Quarter

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine