McDermott awarded Megalodon installation

Published

Houston-based McDermott International won a contract to provide transportation and installation services to Walter Oil & Gas Corp. for the Megalodon platform in South Timbalier Block 311 in the Gulf of Mexico.

McDermott will provide all materials and equipment to transport and install the six-pile platform in 391ft of water, over an existing well site. The heavy-lift Derrick Barge 50 will perform a side-lift of the 3300ton jacket and set the 2100ton topsides. McDermott’s DB50 is dynamically positioned, premier heavy-left, deepwater lowering and pipelay vessel.

Installation is expected to commence in 4Q 2014.

McDermott recently completed the Ayatsil-B, one of Pemex’s four drilling platforms for use in the Mexican national’s Ayatsil-Tekel heavy oil field.

Read more:

Ayatsil-B platform complete

Current News

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Precision Shaft Alignment: A S

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Aquaterra Energy Gets Multi-Ye

Two DOF Vessels Get Work in North Sea and Australia

Two DOF Vessels Get Work in No

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Seatrium Unit Launches Arbitra

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine