CNOOC brings Qinhuangdao online

Published

CNOOC Ltd. announced that its Qinhuangdao 32-6 comprehensive adjustment project has commenced production.

The Qinhuangdao 32-6 oilfield is located at the central north of Bohai Bay with an average water depth of approximately 20m. The main production facilities of Qinhuangdao 32-6 comprehensive adjustment project include four platforms and 99 producing wells. This project is fully on-stream and expected to reach its ODP designed peak production of approximately 36,000 b/d in 2015.

CNOOC is the operator and holds 75.5% working interest in Qinhuangdao 32-6 comprehensive adjustment project with partner Chevron China Energy Co. (24.5%).

Current News

Suriname's Block 52 Could Become Commercial in 18 Months

Suriname's Block 52 Could Beco

Bourbon Wins Prime Energy Contract in Philippines

Bourbon Wins Prime Energy Cont

TDI-Brooks Survey Vessel Gyre Arrives in Liberia

TDI-Brooks Survey Vessel Gyre

CRP Subsea Secures Cable Protection Contract for Offshore Wind

CRP Subsea Secures Cable Prote

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine