Alba B3 ready for Equatorial Guinea

Published

Heerema Fabrication Group (HFG) has loaded out the Alba B3 jacket and topsides ahead of its sail away to Equatorial Guinea, planned for the end of this month. 

The 2000-ton, four-legged jacket, built at the Vlissingen yard in the Netherlands, will support the 4500-ton B3 compression platform, built for Marathon Oil's Alba 3 platform, offshore Equatorial Guinea. The topsides were assembled at Zwijndrecht, also in the Netherlands. 

The Alba field compression project is designed to maintain the production plateau two additional years and extend field life by up to eight years. It is due to be operational by mid-2016, according to a statement from Marathon Oil today. 

Read more

Fast fabrication

Photo from HFG. 

Current News

MFE Inspection Solutions Launches Offshore Division

MFE Inspection Solutions Launc

Seatrium and Aibel Seek Arbitration to Resolve DolWin 5 Disputes

Seatrium and Aibel Seek Arbitr

Viridien, SLB Set to Launch ‘Massive’ OBN Survey Offshore Egypt

Viridien, SLB Set to Launch ‘M

TGS Starts Multi-Client Data Reprocessing Scheme off Australia

TGS Starts Multi-Client Data R

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine