Royal IHC bags Chinese reel lay work

Published

Royal IHC has entered into a contract with Shanghai Salvage in China for the supply of an integrated 550t reel lay system, making it the first reel lay system in the Chinese market.

Illustration from Royal IHC.

The pipelay system, which includes not only rigid pipe but also flexible pipe lay capability, will be installed on the new offshore construction vessel of Shanghai Salvage. 

IHC Engineering Business, a subsidiary of Royal IHC, will lead the project, with engineering concept design already well underway. Project execution of this complex system will be managed by IHC Engineering Business, with close cooperation of its sister companies and strategic partners in both Europe and China. The system will be installed on the client’s new build vessel during Q1 2020, followed by sea trails.

Dave Vander Heyde, CEO Royal IHC: “We are very proud to have been selected by Shanghai Salvage as their partner for this innovative pipelay system due to our strong track record for sophisticated pipelay systems. IHC has been active in the Chinese market for over 30 years, delivering dredging vessels, dredging equipment and multiple offshore systems like pipelay systems and AHC deepwater lowering systems. This new contract with Shanghai Salvage further strengthens our position in this important market for Royal IHC.”  

Current News

BOEM Initiates Process for Potential Mineral Lease Sale Offshore Virginia

BOEM Initiates Process for Pot

Jumbo Scoops Two Offshore Wind Contracts

Jumbo Scoops Two Offshore Wind

Wood Nets Long-Term Maintenance Contract for Rio Grande LNG Facility

Wood Nets Long-Term Maintenanc

TechnipFMC to Supply Subsea Systems for Chevron’s Gas Project off Australia

TechnipFMC to Supply Subsea Sy

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine