Husky, CNOOC start up BD gas field

Joint operator Husky-CNOOC Madura has started first production from the BD gas field in Indonesia.

The BD gas field is in the Madura Strait in 55m water depth. It is being produced via an unmanned wellhead platform, a floating production, storage and offloading vessel and four production wells.

Currently, the gas field has two wells in production and its gas and condensate sales production is approximately 7200 boe/d. The gas field is expected to reach its designed peak production of about 25,500 boe/d in 2018.

Husky-CNOOC Madura is the operator of the production sharing contract the BD gas field. Husky and CNOOC each hold a 40%, with the remaining 20% interest is held by Samudra Energy.

Current News

US Plans 12 Offshore Wind Auctions Over Five Years

US Plans 12 Offshore Wind Auct

Equinor Wraps Up Hammerfest LNG Leak Repair, Maintains Friday Restart

Equinor Wraps Up Hammerfest LN

Namibia Targets First Oil Production from Venus Field in 2029/2030

Namibia Targets First Oil Prod

Second HVDC Platform Installed at World’s Largest Offshore Wind Farm

Second HVDC Platform Installed

Subscribe for OE Digital E‑News

Offshore Engineer Magazine