Drilling News

 

Murphy brings Dalmatian online

Aug 01, 2014

Production began from two “high-rate” wells at Murphy Oil’s Dalmatian development in the US Gulf of Mexico. The US-based company announced that the project came online during its 2Q 2014 earnings report. Murphy Oil said the results were “better than planned…

Building a safety case

Aug 01, 2014

Girish U. Pai, Devendra Awadhiya and Zubin Fatakia discuss the evolution of safety case in designs for offshore platforms. Offshore installations are exposed to nature’s fury all the time. The operations involve handling very heavy modules weighing tens of thousands of tons…

What will it take to develop offshore heavy oil?

Aug 01, 2014

The Mariner development concept. Images from Statoil.  The Mariner heavy oil field took 40 years, 12 oil companies, five seismic surveys, and 18 exploration/appraisal wells to get to where it is today…

Rosneft deals beat EU sanctions

Aug 01, 2014

Rosneft and North Atlantic Drilling Ltd. (NADL) executed multiple long-term offshore drilling contracts at the end of July, just before the newest round of European Union (EU) and US-issued sanctions were enacted. Rosneft committed to six offshore drilling units until 2022…

Adding a secondary barrier against gas migration in deepwater environments

Aug 01, 2014

Secondary mechanical pressure barriers could help ease regulatory bodies’ concerns around effective zonal isolation in wells.  The Cytadel ZX packer can be activated by dropping a magnetic signal carrier from the surface…

Planning for success

Aug 01, 2014

Optimum completion. Photo from Weatherford. Weatherford’s Yvonne McAnally and Ben Lake show how collaboration and integrated methodology delivered an operator’s first subsea well project in Norway…

Point by point: intervention

Aug 01, 2014

In advance of OE’s 2014 Deepwater Intervention Forum held in Galveston, Texas, Managing Editor Audrey Leon spoke with representatives of Helix Energy Solutions, FMC Technologies, and consultant Robert Keith of R.J. Keith & Associates, to discuss topics affecting the intervention sector…

Metal-to-metal completion technology

Aug 01, 2014

Metalmorphology is the process of shaping metal downhole to provide a metal-to-metal, gas-tight seal for the life of the well. Photos from Meta. Well integrity has been defined by…

Combating fatigue

Aug 01, 2014

Fig. 1: Illustration of riser acceleration vs. wave height. Images from 2H Offshore.  Michael Long Ge and Himanshu…

Meeting lifting standards

Aug 01, 2014

The Heidrun FSU crane in Protea’s yard, Poland. Photo from Protea. Protea has designed its largest crane to date for Statoil’s Heidrun FSU, a project that will aid the life extension of the Heidrun field…

BPZ Energy spuds Corvina well off Peru

Jul 31, 2014

BPZ Energy spud the CX15-7D development well in the Corvina field in Block Z-1, offshore Peru, on 29 July 2014, the company announced today. BPZ Energy plans to drill to 8500ft depth and expects operations to complete in October. BPZ…

Global offshore drilling to grow 10.9% annually, next 5 years

Jul 31, 2014

Research and Markets analysts forecast that the global offshore drilling market will grow at a compound annual rate of 10.9% (CAGR) over the period 2013-2018. One of the key factors contributing to this market growth is the increase in…

API publishes new capping stack guidelines

Jul 31, 2014

The American Petroleum Institute (API) published new guidelines for the design, manufacture and use of subsea capping stacks, equipment designed as part of industry’s emergency preparedness in the event of a spill at a wellhead on the ocean floor…

P&A problems

Jul 30, 2014

The Fugro Synergy. From Fugro Drilling and Well Services. Plugging and abandonment accounts for about 43% of decommissioning costs. Operators and service companies are looking at ways to reduce the bill…

Apache finds gas off Western Australia

Jul 29, 2014

Houston-based Apache Energy found gas and associated liquid hydrocarbons in the Phoenix South-1 well off Western Australia, in the Roebuck basin, before a drill bit failure on 29 July. Over the past two weeks, Apache drilled to a depth…

Current News

Shell Greenlights Waterflood Project to Bolster Production in Gulf of America

Shell Greenlights Waterflood P

ESVAGT Acquires Two SOVs from Edda Wind

ESVAGT Acquires Two SOVs from

Dräger to Supply Gas Detection, Monitoring Tech to North Sea Operator

Dräger to Supply Gas Detection

NKT Expands Swedish Cable Accessories Plant Amid Rising Demand

NKT Expands Swedish Cable Acce

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine