Dolphin Drilling’s Blackford Dolphin Secures More Work for Oil India

Wednesday, July 8, 2026

Dolphin Drilling has secured a further extension for its deepwater-capable semi-submersible rig Blackford Dolphin with Oil India, keeping the rig on contract until at least August 28, 2026.

The extension will allow completion of drilling, testing and abandonment work at locations east of India under the same terms and scope of work as the existing contract.

The latest extension follows an earlier prolongation of the contract through the end of July 2026 for the same drilling, testing and abandonment work offshore eastern India.

“Dolphin Drilling values its ongoing partnership with Oil India Limited and remains committed to delivering safe and efficient operations,” the company said.

The Blackford Dolphin, built in 1974 and upgraded in 2008, has a maximum operating water depth of 6,000 feet (1,829 metres) and can drill to depths of up to 30,000 feet (9,144 metres).


Categories: Drilling Industry News Activity Asia Rigs Oil and Gas Natural Gas Drilling Hardware FLNG Deepwater Shallow Water Maintenance

Related Stories

Borr Drilling Lines Up New Work for Jack-Up Rig Trio

SBM Offshore Taps Chinese Contractor for FPSO Topside Modules

Arabian Drilling Inks $533M Deal for Four Jack-Up Drilling Rigs

Current News

Sumitomo Corporation Global Metals, TFI Marine Introduce Mooring Solutions to Floating Offshore Wind

FET Appoints Amariko as Dynacon Representative in Japan

Chevron Joins SLB, TotalEnergies Digital Subsurface Collaboration

Normand Maximus CSV Set for $125M Ownership Transfer

Subscribe for OE Digital E‑News