Cadeler’s WTIV Newbuild En Route to Europe for Maiden Offshore Wind Job

Thursday, December 4, 2025

Hanwha Ocean has delivered the Wind Mover wind turbine installation vessel (WTIV) to offshore wind contractor Cadeler, completing the second vessel in the company’s M-class series about one month ahead of schedule.

The vessel was formally signed over on November 28 and sailed away on December 2, following a naming ceremony at Hanwha Ocean’s shipyard in Korea.

Wind Mover is the second of two WTIVs ordered by Cadeler in 2021, with the first vessel, Wind Maker, delivered in January 2025. One vessel will operate in Taiwanese waters while Wind Mover is scheduled to begin work in Europe.



Wind Mover has become the tenth WTIV in Cadeler’s fleet and the fifth newbuild the company has received this year, doubling its installation fleet from five to ten vessels. Cadeler expects to operate 12 vessels by mid-2027, which it said will form the largest and most versatile WTIV fleet in the offshore wind industry.

The design of the vessel was developed in cooperation with partners including Hanwha Ocean, ABB, Kongsberg, GustoMSC and Huisman.

Wind Mover is equipped with a 2,600-tonne main crane, a DP2 positioning system, and is capable of operating in water depths up to 65 meters, enabling installation and maintenance of next-generation offshore wind turbines and foundations.

“The delivery of Wind Mover, ahead of schedule, represents another step in our long-term strategy to operate the most advanced and versatile fleet in the offshore wind sector. With both Wind Mover and Wind Maker now delivered, we are well-equipped to meet the scale and complexity of global offshore wind projects. After her delivery, Wind Mover will head straight to work installing and maintaining the largest turbines in the market,” said Mikkel Gleerup, CEO of Cadeler.

Categories: Inspection & Repair & Maintenance ROV & Dive Support Construction Vessel Shipbuilding Offshore Vessels Renewable Energy Offshore Wind WTIV Wind Turbine Installation Vessel Industry News Activity

Related Stories

JERA Nex bp Acquires EnBW’s Stake in Mona Offshore Wind Farm

DEME Takes Delivery of Norse Energi Wind Turbine Installation Vessel

RWE Wins Almost 7GW in UK’s Record 8.4GW Offshore Wind Auction

Current News

Seatrium and Aibel Seek Arbitration to Resolve DolWin 5 Disputes

Viridien, SLB Set to Launch ‘Massive’ OBN Survey Offshore Egypt

TGS Starts Multi-Client Data Reprocessing Scheme off Australia

TMC to Deliver Equipment for Mexico-Bound FSO

Subscribe for OE Digital E‑News