Enauta Restarts Production from Atlanta Field's 2HP Well in Brazil

Wednesday, April 19, 2023

Brazilian oil company Enauta has resumed production from the 7-ATL-2HP-RJS (“2HP”) well in Atlanta offshore field in Brazil, after a halt in early March.

Enauta said this week that production had resumed after the installation of the new pump on the seabed. 

"Enauta will keep the market informed of relevant events related to the matter," the company said without providing info on the field's current output levels.

Enauta produces oil from the Atlanta field using the Petrojarl I FPSO, which has a production capacity of 30,000 barrels of oil per day and a storage capacity of 180,000.

Late in March, Enauta said that daily production was around 22 thousand bbl/d from the Atlanta Field (without contribution from the 2HP well).

Categories: Industry News Activity FPSO Production South America Floating Production

Related Stories

PRIO Ramps Up Wahoo Output with Third Well Offshore Brazil

Prysmian Shares North American Leadership Transitions

PRIO Brings Second Wahoo Well Online off Brazil

Current News

Van Oord Completes Low-Noise Monopile Installation

Orsted: Middle East Energy Crunch Rejuvenates Europe Offshore Wind Push

Oxy Makes Oil Discovery at Bandit Prospect in Gulf of America

Northern Lights Adds Third CO2 Carrier to Expand CCS Network

Subscribe for OE Digital E‑News