Fugro Done with Geophysical Work at Qatar's North Sea Field

Tuesday, July 21, 2020

Fugro has completed the first phase of its offshore site investigation for Qatargas’ North Field Production Sustainability’s Compression Phase.

The Dutch company started the fieldwork started in March. The first phase marks the completion of the geophysical scope, while the geotechnical scope in phase two will run as planned until August this year. 

The fieldwork is being performed by in-country project teams from Fugro’s dedicated vessels Proteus and Adventurer and includes cone penetration testing and P-S logging results. 

The final deliverables – comprising a bathymetric and geophysical survey and a geotechnical appraisal of the soils encountered – will be used to optimize jacket platform pile foundation design, and pipeline and cable-route engineering, in Qatar’s giant North Field.

The North Field is the largest non-associated gas field in the world and is located 80 nautical miles off the north coast of Qatar.

Categories: Vessels Middle East Geoscience Activity Geophysics Geotechnical

Related Stories

Asia's Oil Industry Braces for Prolonged Hormuz Disruption

Oil Jumps as Houthi Strikes Disrupt Saudi Energy Operations

Iran Outlines Terms for Restoring Hormuz Shipping

Current News

Skyborn Reaches Financial Close on Gennaker Offshore Wind Farm

Ørsted Gets Favorable Tax Opinion on Two UK Wind Farms

GONDAN Launches Its Largest-Ever Vessel Built for Østensjø Rederi

IEA Sees Bigger Oil Supply Gap as Gulf Recovery Slips into 2027

Subscribe for OE Digital E‑News