Fugro Done with Geophysical Work at Qatar's North Sea Field

Tuesday, July 21, 2020

Fugro has completed the first phase of its offshore site investigation for Qatargas’ North Field Production Sustainability’s Compression Phase.

The Dutch company started the fieldwork started in March. The first phase marks the completion of the geophysical scope, while the geotechnical scope in phase two will run as planned until August this year. 

The fieldwork is being performed by in-country project teams from Fugro’s dedicated vessels Proteus and Adventurer and includes cone penetration testing and P-S logging results. 

The final deliverables – comprising a bathymetric and geophysical survey and a geotechnical appraisal of the soils encountered – will be used to optimize jacket platform pile foundation design, and pipeline and cable-route engineering, in Qatar’s giant North Field.

The North Field is the largest non-associated gas field in the world and is located 80 nautical miles off the north coast of Qatar.

Categories: Vessels Middle East Geoscience Activity Geophysics Geotechnical

Related Stories

Equinor Hires Havila Shipping’s PSV

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Jan De Nul’s Fleeming Jenkin CLV to Get Dedicated Training Simulator

Current News

Ndungu Full-Field Starts Up Offshore Angola

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

AKOFS Offshore Inks New Vessel Deal with Petrobras

UK Trade Body Challenges Government View on North Sea Gas Decline

Subscribe for OE Digital E‑News