Fugro Done with Geophysical Work at Qatar's North Sea Field

Tuesday, July 21, 2020
Fugro Proteus - Credit: Fugro

Fugro has completed the first phase of its offshore site investigation for Qatargas’ North Field Production Sustainability’s Compression Phase.

The Dutch company started the fieldwork started in March. The first phase marks the completion of the geophysical scope, while the geotechnical scope in phase two will run as planned until August this year. 

The fieldwork is being performed by in-country project teams from Fugro’s dedicated vessels Proteus and Adventurer and includes cone penetration testing and P-S logging results. 

The final deliverables – comprising a bathymetric and geophysical survey and a geotechnical appraisal of the soils encountered – will be used to optimize jacket platform pile foundation design, and pipeline and cable-route engineering, in Qatar’s giant North Field.

The North Field is the largest non-associated gas field in the world and is located 80 nautical miles off the north coast of Qatar.

Categories: Vessels Middle East Geoscience Activity Geophysics Geotechnical

Related Stories

Island Frontier MSV Wraps Up West Africa Campaign for Oceaneering

Island Frontier MSV Wraps Up West Africa Campaign for Oceaneering

First Oil from Mero-4 FPSO in Brazil pre-salt

First Oil from Mero-4 FPSO in Brazil pre-salt

Tidal Transit Welcomes New CTV to Its Fleet

Tidal Transit Welcomes New CTV to Its Fleet

Current News

Aker Solutions Awarded Contract for BalWin2 Offshore Wind Project

Nigeria Introduces Oil Tax Relief for Cost-Cutting Measures Implementation

Gazelle Secures Multi-Million Funding for Floating Wind Demo

OMV Exits Ghasha Gas Project off UAE with Lukoil Stake Sale

Subscribe for OE Digital E‑News

Offshore Engineer Magazine