Edvard Grieg Field Must Tap Land Power from 2022

Monday, December 17, 2018

Lundin Petroleum must redesign the electricity supply to its Edvard Grieg oilfield, in line with plans laid when the company won permission to develop the North Sea resource in 2012, the Norwegian energy ministry said on Friday.

Currently powered with gas turbines, the field's electricity should be supplied via power cable from land from 2022 onwards, coinciding with the startup of the second phase of the nearby Johan Sverdrup oilfield, which will also use land-based power.

The Sverdrup phase 1, Gina Krog and Ivar Aasen fields will also get power from land in a bid to cut emissions from the extraction of oil and gas.


(Reporting by Terje Solsvik, editing by Ole Petter Skonnord)

Categories: Europe Production

Related Stories

AKOFS Offshore Inks New Vessel Deal with Petrobras

MOL’s Geoinform, Baker Hughes Team Up for Oil and Gas Tech

Shell Reserve Decline Raises Need for Deals or Discoveries

Current News

Ndungu Full-Field Starts Up Offshore Angola

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

AKOFS Offshore Inks New Vessel Deal with Petrobras

UK Trade Body Challenges Government View on North Sea Gas Decline

Subscribe for OE Digital E‑News