Edvard Grieg Field Must Tap Land Power from 2022

Monday, December 17, 2018

Lundin Petroleum must redesign the electricity supply to its Edvard Grieg oilfield, in line with plans laid when the company won permission to develop the North Sea resource in 2012, the Norwegian energy ministry said on Friday.

Currently powered with gas turbines, the field's electricity should be supplied via power cable from land from 2022 onwards, coinciding with the startup of the second phase of the nearby Johan Sverdrup oilfield, which will also use land-based power.

The Sverdrup phase 1, Gina Krog and Ivar Aasen fields will also get power from land in a bid to cut emissions from the extraction of oil and gas.


(Reporting by Terje Solsvik, editing by Ole Petter Skonnord)

Categories: Europe Production

Related Stories

Ukraine Strikes Russian Oil Rig in Caspian Sea, Disrupts Production

Sea Lion Oil Project in Falkland Islands Gets Green Light

Solstad Scoops $25M in New CSV Contracts in Brazil and North Sea

Current News

TGS Gets Streamer 4D Job Offshore Brazil

DeepOcean Extends IMR Services Deal with Equinor

Serica Energy Completes Acquisition of Prax Upstream

Equinor, Partners Okay $395M Johan Castberg Tie-Back Scheme

Subscribe for OE Digital E‑News