Edvard Grieg Field Must Tap Land Power from 2022

Monday, December 17, 2018

Lundin Petroleum must redesign the electricity supply to its Edvard Grieg oilfield, in line with plans laid when the company won permission to develop the North Sea resource in 2012, the Norwegian energy ministry said on Friday.

Currently powered with gas turbines, the field's electricity should be supplied via power cable from land from 2022 onwards, coinciding with the startup of the second phase of the nearby Johan Sverdrup oilfield, which will also use land-based power.

The Sverdrup phase 1, Gina Krog and Ivar Aasen fields will also get power from land in a bid to cut emissions from the extraction of oil and gas.


(Reporting by Terje Solsvik, editing by Ole Petter Skonnord)

Categories: Europe Production

Related Stories

NMC Energy Turns to Digital Twins to Cut Decom Costs

Siemens Gamesa to Supply Turbines for 1GW Offshore Wind Farm

Damen Delivers Hybrid CSOV for Purus Offshore Wind Operations

Current News

Chevron Vessel Begins Gas Survey Offshore Greece

ExxonMobil Greenlights $4B Kizomba Revamp with Fresh Discovery off Angola

Japan's KEPCO Joins 390MW Polish Offshore Wind Project

Türkiye Set for Offshore Seismic Surveys in Pakistan Ahead of 2027 Drilling

Subscribe for OE Digital E‑News