Pigging panel built for Goliat

OE Staff
Thursday, July 17, 2014

UK-based Smith Flow Control (SFC) has designed a specialist pigging panel to be installed on a floating production, storage and offloading facility (FPSO) built for the use in the Goliat field, the first oilfield to be developed in the Barents Sea.

SFC’s custom-built pigging panels will be used to control a series of actuated valves and ensures the safe opening of the pig vessel closure door. The panel itself is designed and built to exacting standards which incorporates the strict environmental requirements stipulated for operations in the Barents Sea.

The stainless steel electronic panel, specifically engineered for Arctic conditions, conforms to Zone 1 Ex de classification and protection class IP66. It is designed to support applications in the most aggressive environments, suitable for temperatures ranging between -40 to +55 degrees Celsius (-40 to +131 degrees Fahrenheit) with an anti-reflective coating that eliminates glare from the sun.  

The panel is designed to meet strict safety guidelines and regulatory body requirements and works as a communication and verification system, improving efficiency and safety in the most testing conditions.

The panel is designed around the requirement to isolate power to the panel, with two interlocked key units to ensure a specific sequence of operation:

  • The operator selects to close the valves as required
  • Red LED lights verify that the valves have reached their fully closed position
  • When all valves are closed, the operator can isolate the panel by removing the ‘A’ Key
  • The ‘A’ key is then entered into the solenoid key unit and only when the safety and automation system confirms all valves are closed, a permissive signal is sent to energise the solenoid and release the ‘B’ key
  • This allows the operator to safely continue the mechanical interlocking sequence and, in this instance, only after the panel has been isolated and all the valves have been closed and locked, will the key be available to manually unlock the pig trap door to load or unload a pig.

The operating panel can be used in a wide variety of applications involving actuated valves.  Manual valves can also be included within the key system logic (vent & drain), for example to launch or receive a pig. The panel has been designed with the operator in mind, providing a safe and simple means of controlling valves for the most complex of processes.

 
Categories: Europe Pipelines North Sea

Related Stories

QatarEnergy, ExxonMobil Explore Cyprus Gas Exports via Egypt’s Infrastructure

DeepOcean Lines Up North Sea FPSO Decom Job

Viridien Kicks Off Multi-Client OBN Survey in North Sea’s Frigg Area

Current News

Copenhagen Infrastructure Partners Remains Eager to Invest in Italian Offshore Wind

Sercel Nodal Technology Chosen by OGDC for Wireless Seismic Acquisition Project

Weatherford Wins Deepwater Completions Contract off Nigeria

QatarEnergy, ExxonMobil Explore Cyprus Gas Exports via Egypt’s Infrastructure

Subscribe for OE Digital E‑News