Aasta Hansteen installation timelapse

OE Staff
Monday, October 3, 2016

In this video, Statoil shows a timelapse of installation work at Aasta Hansteen conducted by Subsea 7.

Pipelines, risers and spools were installed and hooked up to subsea templates and umbilicals that were installed last year. 

The pipelines have been pressure-tested and prepared for production, and mooring lines have been carefully installed on the seabed – everything has to be ready before the platform arrives in 2018.  The Aasta Hansteen gas discovery (previously Luva) in the Norwegian Sea is situated at 1300m water depth in the Vøring area, 300km from land.

Categories: Europe Installation

Related Stories

Transocean Secures $184M for Drilling Rigs Operating off Norway

HydroWing Wins 10MW CfD Boost for Morlais Tidal Energy Project

ORLEN Acquires Stake in Afrodite Discovery from Vår Energi

Current News

QatarEnergy Receives Offshore Exploration License From Libya

Libya Awards First Oil Blocks Since 2007 to Chevron, Eni

TGS Embarks on Multi-Client 2D Survey off Angola

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Subscribe for OE Digital E‑News