Offshore North America News - page 218


Rowan inks extension deals

Jul 01, 2016

Rowan Companies is putting a jackup on stand by for Apache Corp., in addition to inking three rig extensions in the Gulf of Mexico, offshore Norway, and Saudi Arabia, according to the company’s latest fleet report. The Rowan Gorilla VII…

Embracing wind

Jul 01, 2016

While the US is only on the verge of bringing its first wind farm online, Audrey Leon surveys some of the prospects slated for the country’s federal waters. LEEDCo’s mono bucket foundation. Photo from DOE…

Building blocks

Jul 01, 2016

Audrey Leon profiles Block Island Wind Farm, which is destined to be the US’s first offshore wind project when it starts up later this year. Jacket foundations, built by Gulf Island Fabrication…

Staying ahead of downtime

Jul 01, 2016

Improved visibility and predictive maintenance can help keep operations running, says Rockwell Automation’s Luis Gamboa. Image from iStock. Minimizing downtime is a goal for every offshore oil and gas operation…

Offshore wind rebounds

Jul 01, 2016

Cape Wind is a 130 x 3.6MW turbine offshore wind park planned for off Cape Cod, Massachusetts. But, it has been struggling to get off the ground for some 15 years, says Stephanie McClellan, director, special initiative on offshore wind, University of Delaware…

PJ Valves open new piping business

Jun 30, 2016

PJ Valves (PJV), a manufacturer and supplier of valves, has started a new piping business, PJ Piping (PJP), in response to demand in the market for a simplified pipe, valves and fittings (PVF) supplier process. Located in Houston, TX, the…

Mexico, US, Canada unite in climate pact

Jun 29, 2016

Mexico is joining the US and Canada in committing to reduce North America’s methane emissions from the oil and gas sector – the world’s largest methane source – 40% to 45% by 2025, the three countries announced in a joint statement. Image…

BP, Seadrill reach West Capricorn agreement

Jun 29, 2016

Seadrill Partners has reached an agreement with BP to keep the West Capricorn on an extended standby rate of US$316,000/d with expected recommencement of work in late 2017 at the full operating rate of $526,000/d. The unit had been down…

Fugro deploys second vessel for Gigante Survey

Jun 29, 2016

Fugro has deployed multi-purpose offshore survey vessel Fugro Gauss to join the Fugro Brasilis offshore Mexico, to help complete the world’s largest seep-hunting survey for multiclient geoscience data company, TGS. Both Fugro vessels…

UH researcher develops new tertiary recovery method

Jun 27, 2016

As oil producers struggle to adapt to lower prices, getting as much oil as possible out of every well has become even more important, despite concerns from nearby residents that some chemicals used to boost production may pollute underground water resources…

Technip, FMC get early US antitrust clearance

Jun 27, 2016

Technip and FMC Technologies announced that the pending US$13 billion merger transaction between the companies has received an early decision from the United States antitrust regulators under the Hart-Scott-Rodino Antitrust Improvements Act of 1976 (HSR Act)…

Noble paid US$540 million by Freeport

Jun 23, 2016

Freeport-McMoRan (FCX) paid out a US$540 million settlement to Noble Corp. after canceling two rig contracts operating in the Gulf of Mexico in May.   The Noble Sam Croft. Image from Noble Corp…

Shell resumes Canada drilling after riser drop

Jun 23, 2016

Shell has been cleared to resume drilling offshore Canada following a review to its procedures after an incident saw a 2km riser section drop to the seafloor.  Shell was drilling the Cheshire L-97 well, in about 2000m water depth, in the Shelburne basin…

Delta SubSea, Boskalis enter GoM MoU

Jun 22, 2016

Delta SubSea and Boskalis Subsea Services have entered into a memorandum of understanding (MoU) to provide integrated diving and ROV solutions in the Gulf of Mexico. Image from Boskalis. The…

Franks runs first string weight reduction system

Jun 22, 2016

Frank's International deployed its patented 1250-tonne Buoyancy Module (BM) Spider along with ExPert Landing String Solutions’ (ExPert) Drill Pipe Buoyancy Modules to help Anadarko achieve a nearly 250,000-pound reduction in total weight…

Current News

North Sea Boulevard on Maasvlakte Reopens After TenneT Offshore Wind Cable Installation

Orsted Sells 55% Stake in Taiwan Offshore Wind Farm to Cathay

Sperra Seaworks, Bardex to Advance Floating Construction Station for UK Offshore Wind

Aphrodite Gas Field off Cyprus Advances as Partners Approve FEED Phase

Subscribe for OE Digital E‑News