A new flow assurance solution promises improved accuracy as part of a next-generation integrated production management system and as a standalone engineering tool. OE looks at LedaFlow’s performance to date and future potential.At 143km, the…
Remediating plugged subsea lines in deep and ultra-deepwater is dangerous and time-consuming and can become extremely costly if coiled tubing or wireline intervention is required to resolve the problem. Champion Technologies’ Jeremy Lee describes…
Hydrate formation in oil and gas operations has been a multi-billion dollar problem for many years. Nalco's Noah Morales discusses some of the chemicals his company has developed in answer to hydrate challenges and provides a case history about one of its new low dose hydrate inhibitors (LDHIs)…