Goliat’s voyage to Norway

Published

In this video, Eni shows the Goliat’s voyage from Korea to the Barents Sea.

Eni’s operated cyclindrical floating production, storage and offloading (FPSO) platform was built in South Korea and is now operating in the Barents Sea.

The 107m-diameter Goliat platform, which will produce the first oil from the Barents Sea, in what will be the world's northern-most offshore oil field, was loaded on to the Dockwise Vanguard - the largest marine transport vessel in the world.

Tie-in operations and preparations for production, in field, will take place during the summer, with first oil scheduled for the middle of 2015. 

The Goliat was loaded and began its trip to Norway in early February.  

Read more:

Goliat en-route to Barents Sea

IKM inks Goliat service contract

Current News

Petrobras Picks TechnipFMC for Flexible Flowlines Delivery off Brazil

Petrobras Picks TechnipFMC for

Framo Signs Record Pump Service Deal for Petrobras FPSO Fleet

Framo Signs Record Pump Servic

Equinor Ups Snøhvit Future Cost Estimate to $2.8B, Timeline Unchanged

Equinor Ups Snøhvit Future Cos

Yinson Production Raises $1.46B to Refinance Agogo FPSO

Yinson Production Raises $1.46

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine