BP Rig Zigzags in Chase with Greenpeace Ship

June 17, 2019

Greenpeace ship Arctic Sunrise follows the BP chartered Transocean drilling rig Paul B Loyd Jr en route to the Vorlich field in the North Sea. The environmental activism group is calling for BP to halt drilling for new oil. (© Greenpeace / Jiri Rezac)
Greenpeace ship Arctic Sunrise follows the BP chartered Transocean drilling rig Paul B Loyd Jr en route to the Vorlich field in the North Sea. The environmental activism group is calling for BP to halt drilling for new oil. (© Greenpeace / Jiri Rezac)

A BP drilling rig heading to an oilfield in the British North Sea has been forced to turn away twice over the past two days as a Greenpeace vessel protesting climate change tries to hamper its progress.

The high-sea chase is the latest step in Greenpeace's nine-day effort to stop the 40,000 tonne Paul Loyd JNR rig from reaching the Vorlich oilfield to start its drilling campaign.

The vessel left Cromarty Firth, north of Inverness, Scotland on Friday after police twice removed activists who had climbed and spent several days on one of the rig's legs.

But it was forced to turn away twice from its destination over the past 48 hours as Greenpeace's Arctic Sunrise vessel followed it, the activist group said.

The Paul Loyd JNR is currently heading west towards Peterhead and away from the Vorlich field, according to Greenpeace and www.marinetraffic.com ship tracking website.

"We are determined to stop BP drilling new oil wells in the North Sea," Sarah North, Greenpeace International climate activist on the Arctic Sunrise said in a statement.

BP slammed Greenpeace and said it had secured an injunction against the Arctic Sunrise.

"Given Greenpeace's repeated interference and reckless actions directed at our lawful business and their continued illegal defiance of court orders and police action, we have ... this injunction as a precautionary measure to protect the safety of people and operations," a BP spokesman said in a statement.

BP announced last year plans to invest 200 million pounds ($251.16 million) to develop the Vorlich field in the central North Sea which holds some 30 million barrels of oil and gas equivalent.

It is expected to start production in 2020 with an output of 20,000 barrels per day, according to BP's website.


($1 = 0.7963 pounds)

(Reporting by Ron Bousso; editing by Emelia Sithole-Matarise)



Current News

Schlumberger Profit Beats Estimates

Schlumberger Profit Beats Estimates

Petrobras Posts Another Major Production Boost

Petrobras Posts Another Major Production Boost

Eni CEO: No Future for Firms Working in Just O&G

Eni CEO: No Future for Firms Working in Just O&G

TechnipFMC Wins EPCI Contract from Woodside

TechnipFMC Wins EPCI Contract from Woodside

Partners Plan Floating Wind Farm in South Korea

Partners Plan Floating Wind Farm in South Korea

Maersk Drilling Scores POSCO Contract

Maersk Drilling Scores POSCO Contract

Woodside Makes FID for Pyxis Hub Project

Woodside Makes FID for Pyxis Hub Project

Magazine

Offshore Engineer (Sep/Oct 2019)

This issue of Offshore Engineer is dedicated to Big Data and Digitalization

Archive
Subscribe

Subscribe for OE Digital E‑News

OE Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week