Edvard Grieg Field Must Tap Land Power from 2022

Published

Edvard Grieg (Photo: Lundin Petroleum)
Edvard Grieg (Photo: Lundin Petroleum)

Lundin Petroleum must redesign the electricity supply to its Edvard Grieg oilfield, in line with plans laid when the company won permission to develop the North Sea resource in 2012, the Norwegian energy ministry said on Friday.

Currently powered with gas turbines, the field's electricity should be supplied via power cable from land from 2022 onwards, coinciding with the startup of the second phase of the nearby Johan Sverdrup oilfield, which will also use land-based power.

The Sverdrup phase 1, Gina Krog and Ivar Aasen fields will also get power from land in a bid to cut emissions from the extraction of oil and gas.


(Reporting by Terje Solsvik, editing by Ole Petter Skonnord)

Current News

Seatrium Gets Repeat Order from IMI for Arabia 4 Jack-up Rig

Seatrium Gets Repeat Order fro

Sea Lion Oil Project in Falkland Islands Gets Green Light

Sea Lion Oil Project in Falkla

ABB’s Streamlined DP2 System Passes Sea Trials on DEME’s Norse Wind WTIV

ABB’s Streamlined DP2 System P

Bourbon Inks Multi-Year PSV Deal with ExxonMobil in Guyana

Bourbon Inks Multi-Year PSV De

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine