Edvard Grieg Field Must Tap Land Power from 2022

Edvard Grieg (Photo: Lundin Petroleum)
Edvard Grieg (Photo: Lundin Petroleum)

Lundin Petroleum must redesign the electricity supply to its Edvard Grieg oilfield, in line with plans laid when the company won permission to develop the North Sea resource in 2012, the Norwegian energy ministry said on Friday.

Currently powered with gas turbines, the field's electricity should be supplied via power cable from land from 2022 onwards, coinciding with the startup of the second phase of the nearby Johan Sverdrup oilfield, which will also use land-based power.

The Sverdrup phase 1, Gina Krog and Ivar Aasen fields will also get power from land in a bid to cut emissions from the extraction of oil and gas.


(Reporting by Terje Solsvik, editing by Ole Petter Skonnord)

Current News

Offshore Well Start-Up to Blame for Mars Crude Contamination, Chevron Says

Offshore Well Start-Up to Blam

Russia Looks to Bolster Gas Supplies to China

Russia Looks to Bolster Gas Su

BP-Eni Joint Venture Finds Gas Offshore Angola

BP-Eni Joint Venture Finds Gas

Iberdrola Picks Up $4.9B to Finance 1.4GW UK Offshore Wind Farm

Iberdrola Picks Up $4.9B to Fi

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine