Technip contract for Snøhvit

Published

Technip was awarded a lump sum contract for pipelay and subsea installations for the Snøhvit CO2 Solution project by Statoil. Snøhvit field is located about 140km north-west of Hammerfest, Norway. The project will establish an additional well at a new CO2 injection template, as well as prepare for gas production from existing templates. The contract covers fabrication and installation of flowlines, including two 5km, 13% chrome, stainless steel production flowlines and a 5km CO2 injection flowline; installation and tie-ins of spools, jumpers and umbilicals; and installation of a new combined production and injection template and manifold. The flowlines will be welded at Technip’s spoolbase in Orkanger, Norway, while installation will be performed by the Apache II in the first half of 2015. Installation of the associated umbilicals, template, manifold, spools and other subsea equipment will be performed by other Technip vessels.

Current News

Equinor’s First Hybrid Power Complex Starts Operations

Equinor’s First Hybrid Power C

Ocean Winds Hires Seaway7 for Offshore Wind Job in Poland

Ocean Winds Hires Seaway7 for

Oman’s Block 50 Offshore Drilling to Advance After $25M Funding Raise

Oman’s Block 50 Offshore Drill

Vissim to Provide Vessel Collision Avoidance System for Qatari Offshore Field

Vissim to Provide Vessel Colli

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine