PFLNG Satu loads first cargo

Petronas’ first floating liquefied natural gas (LNG) facility, PFLNG Satu, has successfully loaded its first cargo at the Kanowit gas field, offshore Sarawak.

The first cargo was fully loaded onto the LNG carrier Seri Camellia which is expected to set sail for a South Asian market.

“This accomplishment effectively demonstrates Petronas’ proven technology and capability of adapting a conventionally land-based installation to a floating LNG facility, a game-changer in today’s LNG business landscape,” says Petronas President and Group CEO Datuk Wan Zulkiflee Wan Ariffin.

Manned by 145 crew onboard, PFLNG Satu is designed for water depths of between 70-200m and possesses a processing capacity of 1.2 MTPA. The facility achieved first gas last November and produced its first drop of LNG a month after. 

Image: PFLNG Satu / Petronas

Current News

Self-drilling Oil Wells to Beat Self-driving Cars to Market, SLB VP Says

Self-drilling Oil Wells to Bea

ABS Approves Autonomous Technologies for Offshore Platforms

ABS Approves Autonomous Techno

Senegal's O3S Orders Fast Supply Vessel from Penguin

Senegal's O3S Orders Fast Supp

Wood Scoops TotalEnergies’ Decarbonization Job in North Sea

Wood Scoops TotalEnergies’ Dec

Subscribe for OE Digital E‑News

Offshore Engineer Magazine