PFLNG Satu loads first cargo

Published

Petronas’ first floating liquefied natural gas (LNG) facility, PFLNG Satu, has successfully loaded its first cargo at the Kanowit gas field, offshore Sarawak.

The first cargo was fully loaded onto the LNG carrier Seri Camellia which is expected to set sail for a South Asian market.

“This accomplishment effectively demonstrates Petronas’ proven technology and capability of adapting a conventionally land-based installation to a floating LNG facility, a game-changer in today’s LNG business landscape,” says Petronas President and Group CEO Datuk Wan Zulkiflee Wan Ariffin.

Manned by 145 crew onboard, PFLNG Satu is designed for water depths of between 70-200m and possesses a processing capacity of 1.2 MTPA. The facility achieved first gas last November and produced its first drop of LNG a month after. 

Image: PFLNG Satu / Petronas

Current News

Ocean Winds Hires Seaway7 for Offshore Wind Job in Poland

Ocean Winds Hires Seaway7 for

Oman’s Block 50 Offshore Drilling to Advance After $25M Funding Raise

Oman’s Block 50 Offshore Drill

Vissim to Provide Vessel Collision Avoidance System for Qatari Offshore Field

Vissim to Provide Vessel Colli

Brazil’s Petrobras Targets Rapid Start-Up at Sudoeste de Tartaruga Verde

Brazil’s Petrobras Targets Rap

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine