Feed Engineering Work News

 

McDermott Nets 'Sizeable' Offshore Platform Design Deal in Middle East

May 18, 2020

Offshore engineering and construction company McDermott has said it has been given 'a sizeable' contract from a Middle East customer to carry out front-end engineering and design (FEED) work for offshore riser platform topsides.McDermott, which didn't say who the client was…

Three Firms Compete for Dorado FPSO FEED. WHP Shortlist 'Soon'

May 14, 2020

Australian oil and gas company Santos, with its partner Carnarvon, is progressing works on the development of the Dorado oil field off W. Australia, with pre-FEED contracts for the FPSO awarded to three 'world-class' contractors. The final investment decision date however…

BHP Awards Trion Platform Pre-FEED to McDermott, Partners

Mar 30, 2020

U.S. offshore installation and construction company McDermott has been awarded a pre-FEED contract for a floating production unit that will be installed at BHP's Trion deepwater oil field offshore Mexico.McDermott said the contract was a sizeable one…

Cameroon: TechnipFMC Clinches Etinde FEED

Mar 04, 2020

Oilfield services giant TechnipFMC has won a front end engineering design (FEED) contract for the development of the offshore IM gas condensate field at Etinde, Cameroon. The Etinde Permit (former Block 7) lies in shallow water in the Rio del Rey Basin…

Wood to Design Chevron's Anchor Offshore Platform

Feb 28, 2020

Engineering company Wood has secured a multimillion-dollar engineering design project for Chevron’s Anchor deepwater development in the Gulf of Mexico.The scope of the project included the preliminary, front end engineering and design (Pre-FEED)…

Woodside Pushes Back Browse FID Again

Feb 14, 2020

Australian oil and gas giant Woodside has delayed the long-expected Final Investment Decision for the massive Browse gas development off W. Australia again. The offshore area comprising the Brecknock, Calliance, and Torosa fields - the Browse resource - sits in the offshore Browse Basin…

Aker Solutions in Study to Electrify North Sea Platforms

Jan 15, 2020

Norway's Equinor has awarded a front-end engineering (FEED) study to Aker Solutions for the electrification of the Troll B and C platforms in the North Sea from shore, with the aim to reduce CO2 emissions from the field.The contract includes an option for the engineering…

McDermott Wins Shwe Phase 3 FEED Contract

Sep 24, 2019

McDermott International said it has been awarded a front-end engineering design (FEED) contract by POSCO INTERNATIONAL Corporation for the Shwe Phase 3 gas field development, located approximately 70 kilometers offshore Myanmar.Building on McDermott's…

Sembcorp Marine Wins Cambo FEED Contract

Aug 29, 2019

Operator Siccar Point Energy said it has awarded an exclusive front-end engineering and design (FEED) contract to Sembcorp Marine for the design of a Sevan cylindrical floating production, storage and offloading unit (FPSO) for its Cambo field development on the UK Continental Shelf…

McDermott Wins FEED Work from Qatar Petroleum

Jul 11, 2019

McDermott International said it has been awarded a contract by Qatar Petroleum to carry out front-end engineering and design (FEED) work for offshore wellhead platforms, pipelines and cables associated with the North Field Expansion project…

Kvaerner Awarded Jackdaw FEED from Shell

Jun 25, 2019

Norwegian based engineering, procurement and construction (EPC) firm Kvaerner said it has been awarded a contract from Shell to perform an early phase design engineering of the planned Jackdaw wellhead platform on the UK Continental Shelf.Kvaerner…

Wood Tallies Grane FEED Contract

Jun 24, 2019

Uk headquartered engineering firm Wood said on Monday it has secured a contract from Norwegian energy firm Equinor to deliver front-end engineering design (FEED) services for brownfield modifications to the Grane offshore facility in Norwegian sector of the North Sea…

Qatar Awards FEED Contract to McDermott

May 28, 2019

Qatar Petroleum said it has awarded the front end engineering and design (FEED) contract for the North Field Expansion Project’s offshore pipelines and topsides facilities to McDermott Middle East Inc.The scope of work awarded includes engineering…

ADNOC Taps McDermott for Umm Shaif

May 09, 2019

McDermott International has been awarded a contract by ADNOC to provide front end engineering design (FEED) services on a design-competition basis for phase one of the Umm Shaif Gas Cap Condensate Development Project. The work scope also includes the preparation and submission of an engineering…

Shell Awards FEED Work for Crux

Feb 06, 2019

Wood and KBR,Inc. have secured a new multimillion dollar contract to deliver integrated front-end engineering design (FEED) for Shell Australia’s Crux project to build a not normally manned (NNM) platform and gas export pipeline located approximately 600km north of Broome…

Current News

TotalEnergies’ Offshore Platform Workers in UK Secure Better Conditions

TotalEnergies’ Offshore Platfo

Petronas Expands Suriname Portfolio with Deepwater Block Acquisition

Petronas Expands Suriname Port

Egypt Still on Hold as Israel Resumes Limited Gas Exports

Egypt Still on Hold as Israel

Norway's Oil and Gas Output Falls Behind Forecast In May

Norway's Oil and Gas Output Fa

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine