Pertamina Unit to Operate Indonesia’s Lavender Block under 30-Year PSC

Friday, April 17, 2026

A unit of Indonesia’s Pertamina has signed a production sharing contract (PSC) for the Lavender block, spanning onshore and offshore areas of Sulawesi island.

PT Pertamina Hulu Energi Sulawesi Lavender will operate the block, which spans 8,206.95 square kilometers across offshore and onshore areas in South Sulawesi and offshore Southeast Sulawesi.

The contract was signed with upstream regulator SKK Migas.

The Lavender block is the sixth new block signed by a subsidiary of Pertamina since 2023.

The block was awarded through a direct offer mechanism under Phase 2 of the 2025 Indonesia Petroleum Bidding Round and will operate under a cost recovery PSC with a 30-year contract duration.

The company plans to conduct geological and geophysical studies, acquisition of 100 km of 2D seismic data and 200 square kilometers of 3D seismic surveys in the first three years of the exploration period.

The agreement reflects Pertamina’s strategy to expand its exploration portfolio and support new oil and gas discoveries and reserves in Indonesia.

Categories: Industry News Activity Asia Oil and Gas Deepwater FPSO Shallow Water Inspection & Repair & Maintenance ROV & Dive Support Construction Vessel Natural Gas FLNG Floating Production

Related Stories

Equinor Exercises Two Well Option for Deepsea Atlantic Rig

Jack-Up Rig Arrives in Indonesia for Conrad Asia Energy's MOPU Conversion

Framo Signs Record Pump Service Deal for Petrobras FPSO Fleet

Current News

Japan Clears DNV for Floating Wind Classifications

DemoSATH Floating Wind Project Enters New Phase with Japanese Partner

Union Vega Offshore Orders Two Breeze-Designed PSVs, Options Four More

Oil Giants Face Spending Dilemma as Iran War Profits Soar

Subscribe for OE Digital E‑News