RWE Renewables Wins 10-Year Service Deal at Greater Gabbard Offshore Wind Farm

OEDigital
Wednesday, June 22, 2022

RWE Renewables has won a bid for the wind turbine service & maintenance deal at the 140 turbine, 504MW Greater Gabbard offshore wind farm, located in the North Sea, around 20km off the coast of Suffolk, UK.

Greater Gabbard offshore wind farm is a joint venture between RWE Renewables (50%) and SSE Renewables (50%) and has been in operation since 2012, generating enough low-carbon renewable energy each year to power the equivalent of over 400,000 UK homes.

"The tender process was conducted by Greater Gabbard Offshore Winds Limited (GGOWL) on behalf of both shareholders to ensure a fair and transparent process," RWE said.

"RWE is well positioned to offer a high-quality service and maintenance to Greater Gabbard and will work very closely with SSE, who will remain the operator on the site," RWE said.

Categories: Energy Renewable Energy Industry News Offshore Wind Activity Renewables

Related Stories

Victoria Launches First Australian Offshore Wind Auction

Fire Puts Greater Changhua 4 Offshore Wind Turbine Out of Service

Van Oord Installs Monopiles at 1.5GW Polish Offshore Wind Farm

Current News

Floatel Triumph Lined Up for Brazil MSU Work

PTTEP, Petronas Ink 35-Year Malaysia-Thailand Gas Deals

PMS Completes Subsea Pipeline Installation at Egypt’s Kamose Gas Field

GHL Seeks to Settle Dolphin Drilling Dispute with Cash, Nigeria Rig Work

Subscribe for OE Digital E‑News