Dogger Bank: Offshore Construction Work Starts at World's Largest Wind Farm

OEDigital
Friday, April 29, 2022

Offshore construction work has officially started on what will become the world's largest offshore wind farm - Dogger Bank - in the UK North Sea, with the installation of the first length of HVDC export cable off the Yorkshire coast.

Cable laying specialist NKT is leading the work to install the Dogger Bank A (first of three 1.2 GW phases) nearshore cable, that will connect the first phase of the windfarm more than 130km off the coast to a landfall point at Ulrome, in East Riding of Yorkshire.

Aberdeenshire-based ACE Winches and LMR Drilling UK Ltd of Birkenhead are among the companies supporting NKT with this work.

The campaign will continue during 2022, with work starting on the export cables for Dogger Bank B in East Riding, and Dogger Bank C on Teesside, in the consecutive years.



"Dogger Bank wind farm will be the first HVDC-connected wind farm in the UK, paving the way for other UK wind farms and suppliers to build on our experience transmitting renewable energy safely and efficiently across long distances while minimizing potential losses," SSE, the operator during the construction phase, said.

 A joint venture project between SSE Renewables (40%), Equinor (40%) and Eni Plenitude (20%), the 3.6GW Dogger Bank wind farm will be the world’s largest offshore wind farm when completed in 2026

Dogger Bank Wind Farm Project Director Steve Wilson, said: "This is an exciting time for everyone involved in this project as we celebrate installing the first nearshore HVDC export cable safely and on time. With the first foundations due to be installed later this year and the first turbines scheduled for installation in 2023, we’re now well on our way to achieving first power from this unrivaled global renewable energy asset.

Dogger Bank Wind Farm is being built in three phases known as A, B, and C. NKT will supply and install the onshore and offshore HVDC cable for all three phases of the project. The company will use its cable-laying vessel NKT Victoria to install the 320kV DC subsea cable system in challenging North Sea conditions.

Categories: Energy Renewable Energy Industry News Activity Renewables Offshore Wind

Related Stories

Windward Offshore to Equip CSOV Newbuild Duo with Seaonics’ Cranes

Deal in Place for 1GW+ Offshore Wind Farm in Southeast Australia

Vestas and Maersk to Build Offshore Wind Logistics Base in South Korea

Current News

SLB, OneSubsea and Subsea7 Sign Up for Wisting and Bay Du Nord Projects

MODEC Completes GHG Emissions Quantification Project for FPSOs in Brazil

Cyprus Seeks Improvements to Chevron-led Plans for Offshore Gas Field

Equinor Seeks to Revive Costly Norway, Canada Oil Prospects

Subscribe for OE Digital E‑News