Sakhalin Energy Starts Maintenance Work at Molikpaq Offshore Platform

Friday, July 31, 2020

Russian oil and gas company Sakhalin Energy has started seasonal maintenance of its Molikpaq offshore oil and gas platform, at the Russian far east.

Sakhalin Energy said Friday that over 300 people, including about 160 maintenance contractor personnel, would be involved in the project.

In addition to multiphase separation equipment clean-up and purging, they will carry out regular turbine inspections, upgrade the platform’s control and safety systems, replace some pipe sections and other equipment. In addition, a tube bundle in one of the platform’s heat exchangers will be replaced with a special-order titanium version. The replacement bundle will soon be delivered to Sakhalin Island and then shipped to the platform, the company said.

The maintenance and inspection activities will take a month to complete. After that, the platform will be fully restarted.

The Molikpaq is the first offshore platform installed in Russian waters as part of the Sakhalin-2 project. In April 2020, it reached a 300 MMbbls milestone since the start of production in 1999.  

Categories: Russia Industry News Activity Asia Inspection & Repair & Maintenance

Related Stories

Incident Reported During Construction of Seaway 7's Alfa Lift Vessel in China

How to Ensure Oil & Gas Infrastructure Still Has Value

Petrobras Takes TechnipFMC's Pipelay Support Vessel on Long-term Charter

Current News

Shearwater Introduces New Seismic Source Technology

Wave Energy Firm Opens Aberdeen Office to Meet Demand from Oil & Gas Industry

UK Fossil Fuel Dilemma in the Spotlight as Climate Talks Near

Iberdrola to Splash $8.24B on Giant Offshore Wind Farm Project in North Sea

Subscribe for OE Digital E‑News